PRODUCT CATEGORIES
FEATURED PRODUCT
CONTACT US
- Add:
- Tel:135-6010-6010
- Fax:135-0000-3081
- E-mail:{Lankecms_email}
- Contacts:{Lankecms_ename}
Your position:Home > Product Show
INTRODUCTION:
Qinnan District Bridge Inspection Vehicle Rental Bridge Beautification Vehicle Rental Call for quotation Xinyue Road and Bridge Free Consultation Hotline 135-0000-3760, Ms. Fang, the same WeChat number, online all the year round, feel free to contact us at any time. Encountering deep water foundations is more difficult. According to the construction experience and actual situation, if the pier structure is free of any disease, the jacking can be carried out directly on the top surface of the cover beam and under the flange plate of the hollow slab girder, but the height of the jack is required not to exceed 3cm. For this purpose, an "ultra-low-height airbag jack" can be used. For the preparation work, set up an operating platform at the pier position. For the waterless area, the bracket is erected, using ordinary scaffolding steel pipes and fasteners to connect; for the pier in the water, the ship is used to build the bracket. The strength and stability of the support should meet the requirements of operation safety. After the support is completed, conduct a comprehensive inspection of each pier support, and make records and numbers. According to the inspection situation, determine the replacement bearing position, bridge span and quantity, and then formulate the best bearing replacement plan according to the traffic operation conditions. The place where the jack is placed should be cleaned up before the operation, so as to facilitate the stable placement of the jack and the backing plate. At the same time, determine the backing plate used by the jack, and the backing plate is made of steel plate (thickness 10mm). Qinnan District Bridge Inspection Vehicle Rental Bridge Beautification Vehicle Rental Call for quotation Xinyue Road and Bridge Free Consultation Hotline 135-0000-3760, Ms. Fang, the same WeChat number, online all the year round, feel free to contact us at any time. The size should not be less than 14cm × 14cm, and it should be placed in front of the corresponding plate support, and a certain number of thin steel plates or wedge-shaped steel plates should be prepared to facilitate the over-pad wedging during the lifting of the plate beam. Load test should be carried out before the air bag jack, air pipe and gate are used to check the effectiveness of each equipment. 3.4 Test the top support frame, operation platform and jack after installation. (1) The temperature measuring holes should be drawn and numbered. Generally speaking, the technical process of bridge reinforcement: steel strip production ~ concrete surface and steel surface treatment ~ glue distribution ~ glue application ~ drilling, rivet fixing steel plate ~ inspection. For the most important construction projects in our lives, first of all, the maintainers must pay attention to the regular maintenance process, so as to effectively ensure the safety and security of the construction system in the unified application. First, take the current professional departments as the most important ones. As far as the replacement of bridge bearings is concerned, the important factors to be paid attention to in the smooth operation of this project are first of all necessary to draw the common attention of all of us. So today, let's take a look at the problems that should be paid attention to in the daily maintenance of bridge bearing replacement. Relevant matters that should be paid attention to in each maintenance link of bridge bearing replacement, this aspect should firstly arouse the common attention of all of us, and then can effectively improve the considerable presentability of this kind of operation project in the future development, so today in the Here, let's take a look at the relevant matters that should be paid attention to in the daily maintenance work of bridge bearing replacement. Different jacking methods should be adopted for different forms of bridges. For the section form composed of T beam or I-beam, generally, the backing plate can be placed under the beam body to be directly lifted with a jack; however, when jacking up hollow slabs and box beams, attention must be paid to the lifting position to avoid The bottom of the beam body is directly jacked up, and it is easy to select the two ribs and the web of the box girder to prevent damage to the beam body. Due to the self-weight of the side beam itself and the influence of the auxiliary facilities of the bridge deck (such as guardrails and connectors at the branch). Qinnan District Bridge Inspection Vehicle Rental Bridge Beautification Vehicle Rental Call for quotation Xinyue Road and Bridge Free Consultation Hotline 135-0000-3760, Ms. Fang, the same WeChat number, online all the year round, feel free to contact us at any time.
{Lankecms_eprev}
{Lankecms_enext}