- Add:
- Tel:135-6010-6010
- Fax:135-0000-3081
- E-mail:{Lankecms_email}
- Contacts:{Lankecms_ename}
INTRODUCTION:
Zhanjiang bridge inspection car rental bridge inspection car rental truss bridge inspection car rental market Xinyue road and bridge free consultation hotline: 1830208001, and carry out construction operation procedures training, check the position and number of expansion joints, check and accept the straightness, flatness, torsion and spacing of expansion joints, complete mechanical equipment, small machines and tools should be in place, In particular, check the integrity rate of the engine, and ensure that there is one as standby to ensure the smooth progress of the construction. Reasonably select the mixing station and the transportation of concrete. C50 steel fiber high-strength concrete is used for the concrete, and segregation is easy to occur during long-distance transportation. Try to ensure the location of the mixing station, make the transportation distance short, and equip with color strips, Geotextile Zhanjiang bridge inspection car rental bridge inspection car rental truss bridge inspection car rental market, steel plate or canvas( 4) Do a good job of preparation before construction to prevent road pollution, do a good job of construction warning signs, cover plastic cloth for protection, in order to prevent the stone powder generated during sawing from polluting the road( 5) Cutting joint: it is required to test the smoothness of asphalt oil surface before cutting expansion joint, and the saw joint shall be neat.Both ends are provided with right angle hooks with a spacing of 20cm. The cantilever bars on each side are connected with three transverse bars with a diameter of 8mm. The top surface of the threaded bar with a diameter of 16mm is 2cm below the bottom of the expansion joint section steel( c) The embedded reinforcement and anchorage reinforcement in the groove shall be straightened out, and rust removal shall be conducted for the embedded reinforcement. At the same time, if it is found that the original embedded reinforcement of beam and slab is insufficient, sufficient expansion bolts shall be drilled in time to ensure the installation quality of section steel. After slotting, vehicles shall be prohibited to pass, and construction personnel and other personnel shall not step on the edges of both sides of the groove to affect the concrete construction quality. Zhanjiang Bridge car rental Bridge car rental truss bridge car rental market