PRODUCT CATEGORIES
FEATURED PRODUCT
CONTACT US
- Add:
- Tel:135-6010-6010
- Fax:135-0000-3081
- E-mail:{Lankecms_email}
- Contacts:{Lankecms_ename}
Your position:Home > Product Show
INTRODUCTION:
Baise bridge inspection car rental truss bridge inspection car rental Guangxi bridge inspection car rental company from 1.7 meters to 2.3 meters. During the construction of the bridge maintenance vehicle, the driving vehicle is usually placed on the sidewalks on both sides of the bridge, so the user can choose the appropriate length of the vehicle body according to the width of the sidewalk of the bridge under construction. The construction personnel on the basket are equipped with a remote control, which can directly control the direction speed of the walking vehicle. There are hidden dangers of external electric shock, and power lines are often densely distributed in the operation area. According to the power strength, it can be divided into high-voltage power (steel tower erection) and civil power (cement column erection). No matter what type of bridge inspection vehicle is allowed to approach and contact. Keep a horizontal distance of more than 20 meters from the high-voltage wire; Baise bridge inspection car rental truss bridge inspection car rental Guangxi bridge inspection car rental company A horizontal distance of more than 5 meters shall be kept from the civil wires. Before the vehicles start the operation, the distribution of power lines in the detection area shall be observed in advance (. Strictly control the leveling of the base course. Before the surface course is paved, the flatness of the base course shall be tested with a 3 m ruler, and the sections with poor flatness and large roughness shall be leveled. If the surface layer is polluted by other processes before paving, such as dropping cement into hard slag on the surface, it shall be removed in time to ensure the flatness of the surface layer. 5. The construction quality of asphalt pavement also depends on the quality of main materials, the mix proportion design of asphalt mixture and the mixing of asphalt mixture. 6. The mix proportion of asphalt mixture is unreasonable, the asphalt aggregate is relatively large, and the paved pavement will produce choking and oil spilling; the asphalt aggregate is relatively small, and the pavement will be loose; the quality of mineral aggregate is not good, the crushing value of aggregate and the compressive strength of stone are too poor, and the content of slender flat particles is too high, which reduces the stability of pavement mixture. Baise bridge inspection car rental truss bridge inspection car rental Guangxi bridge inspection car rental company
{Lankecms_eprev}
{Lankecms_enext}