- Add:
- Tel:135-6010-6010
- Fax:135-0000-3081
- E-mail:{Lankecms_email}
- Contacts:{Lankecms_ename}
INTRODUCTION:
Lianzhou City rental Bridge car inspection Bridge car rental on call condition of poor bridge load test. Its purpose is to test the actual response of the bridge under the most unfavorable load by directly loading the bridge according to the design load, so as to further analyze and understand the working state of the bridge, so as to judge the actual bearing capacity of the bridge structure.(1) Stable and safe work: the bridge inspection vehicle adopts a multi-level safety control system, which can make it work smoothly and ensure the safety of the staff.
(2) Minimum traffic impact: the bridge inspection vehicle can operate smoothly, safely and reliably when it is equipped with hydraulic outriggers and counterweight, which is a method of reinforcement by increasing the cross-sectional area and reinforcement of concrete structures. This reinforcement method requires that the substructure of the strengthened bridge can bear more self weight and provide higher bearing capacity. In general, it is mainly to thicken the bridge or increase the rib width of the main beam.
Sticking steel plate reinforcement method is a structural reinforcement method which uses resin bonded steel plate and concrete. Its construction is fast, there is no wet operation on site or only a small amount of wet operation such as plastering, which has little impact on production and life, and has no significant impact on the appearance and original clearance of the original structure after reinforcement. However, the reinforcement effect depends on the adhesive technology and operation level to a great extent, which is suitable for the reinforcement of bending or tension members under static force and in normal humidity environment. Lianzhou City rental bridge inspection car rental bridge inspection car rental