PRODUCT CATEGORIES
FEATURED PRODUCT
CONTACT US
- Add:
- Tel:135-6010-6010
- Fax:135-0000-3081
- E-mail:{Lankecms_email}
- Contacts:{Lankecms_ename}
Your position:Home > Product Show
INTRODUCTION:
Zhuhai bridge inspection car rental bridge inspection car rental road and bridge inspection car rental on call Xinyue road and Bridge Consulting Hotline: 1830208000 1 cutting machine cutting seam, asphalt concrete pavement outside the SAW seam line shall be protected with adhesive tape paper or covered with plastic cloth, so as to prevent stone powder generated during sawing from polluting the road surface. Saw joints shall be neat and straight. The stone powder should be removed with clean water immediately after cutting the joint. If the cutting is done by dry cutting, that is, without adding water, it should be blown by the blower immediately. Otherwise, it will be difficult to clean the stone powder after it is dried (in case of water), which will cause road pollution. In order to make the expansion joint beautiful and straight in the future, the secondary cutting joint can be used. The width of the secondary cutting joint is not enough, and 5cm is reserved on both sides. After the expansion joint is installed, Zhuhai bridge inspection car will rent bridge inspection car, and road and bridge inspection car will be rented. Xinyue road and Bridge Consulting Hotline: 1830208001 The smoothness and straightness of the section steel shall be controlled within 3 mm, the flatness shall be checked within 2 mm with a 3 m ruler, and the height difference between the top surface of the section steel and the road surface shall be controlled within 2 mm (3 m ruler shall be used for inspection). Problems found shall be handled in time to avoid rework due to the flatness or straightness not conforming to the requirements after the installation of the section steel; after the section steel is positioned, the method of sectional spot welding reinforcement shall be adopted to prevent the section steel from passing through High quality welding rod is used to weld one by one to ensure the welding quality. During the whole installation process, the operation process shall be strictly followed. The installation technical director shall provide technical guidance on site and timely adjust the construction process. Meanwhile, the whole process of supervision shall be on-site and spot check shall be carried out in time. Once problems are found, timely measures shall be taken Ask the construction personnel to carry on the rectification, the quality Zhuhai bridge inspection car rents the bridge inspection vehicle to rent the road and bridge inspection vehicle to rent on call Xinyue road and Bridge Consulting Hotline: 1830208001
{Lankecms_eprev}
{Lankecms_enext}