PRODUCT CATEGORIES
FEATURED PRODUCT
CONTACT US
- Add:
- Tel:135-6010-6010
- Fax:135-0000-3081
- E-mail:{Lankecms_email}
- Contacts:{Lankecms_ename}
Your position:Home > Product Show
INTRODUCTION:
Xiashan bridge inspection car rental Xiashan bridge inspection car rental Xiashan bridge inspection car rental price Xinyue road and Bridge Consulting Hotline: 1830208000 1. Therefore, users can choose the appropriate length of vehicle body according to the width of the sidewalk of the bridge under construction. The construction personnel on the hanging basket are equipped with remote control, which can directly control the direction and speed of the walking car. There are hidden dangers of electric shock in the periphery, and the power lines are often densely distributed in the operation area. According to the power strength, it can be divided into high-voltage electricity (steel tower erection) and civil power (cement column erection). No matter what type of bridge inspection vehicles are allowed to approach or contact. A horizontal distance of more than 20 meters shall be maintained with high-voltage power lines; a horizontal distance of more than 5 meters shall be maintained with civil power lines. Before the vehicles start operation, the distribution of power lines in the detection area shall be observed in advance (for those crossing bridges, parallel bridges, and under bridges), Xiashan bridge inspection cars shall be rented to rent the rental price of Xiashan bridge inspection vehicles Total quality management (TQM) is a management activity that an enterprise organizes all employees and relevant functional departments to work together to develop, develop, produce and provide satisfactory products to customers economically and reasonably in order to ensure and improve product quality or engineering quality. Renting a bridge inspection vehicle does not eliminate the collapsibility of fill or loess. If the foundation of a building is immersed in water during use, it will inevitably cause serious subsidence, inclination or cracking of the building. For the soft soil foundation such as underconsolidated fill and silt, the ground is heavily backfilled and loaded. If the pile foundation scheme is adopted, the negative friction will be ignored Due to the action and calculation of friction force, the insufficient number of piles often leads to excessive settlement of pile foundation. The rental price of Xiashan bridge inspection car is rented by Xiashan bridge inspection vehicle
{Lankecms_eprev}
{Lankecms_enext}