PRODUCT CATEGORIES
FEATURED PRODUCT
CONTACT US
- Add:
- Tel:135-6010-6010
- Fax:135-0000-3081
- E-mail:{Lankecms_email}
- Contacts:{Lankecms_ename}
Your position:Home > Product Show
INTRODUCTION:
Dianbai bridge inspection car rental road and bridge inspection car rental bridge inspection car is complete, Xinyue road and Bridge Consulting Hotline: 1830208001, the pavement should be reworked, and then the expansion joint construction should be carried out, so as to avoid the influence of asphalt surface layer on the construction quality of expansion joint. If the flatness is no problem, the slotting width shall be determined according to the requirements of the construction drawings, the setting out shall be accurate, the cutting machine shall be used to cut the seam, and the asphalt concrete pavement outside the SAW seam line shall be protected with adhesive tape or covered with plastic cloth, so as to prevent the stone powder generated during sawing from polluting the road surface. Saw joints shall be neat and straight. Clean the stone powder with clean water immediately after cutting the joint. If the seam is cut directly by dry cutting, i.e. cutting without adding water, the dianbaiqiao inspection car rents the road and bridge inspection vehicle, and the bridge detection vehicle is equipped with complete equipment. Xinyue road and Bridge Consulting Hotline: 1830208001 should be blown dry immediately with a blower, otherwise it will be difficult to clean after (encountering water) drying, resulting in road pollution. The following measures should be taken: (a) the width of the expansion joint is 5cm at both ends of the steel beam, and 1cm between reinforced concrete beams. If the actual joint width is less than the above provisions, it should be chiseled to the above width. (b) When the actual gap between beams exceeds the provisions of item, and on the premise of ensuring the joint width, concrete shall be used as much as possible, and a 16mm diameter threaded cantilever reinforcing bar shall be set. Its horizontal length is half of the width between saw joints minus 6cm, and both ends are provided with right angle hooks, and the spacing is 20cm. The cantilever reinforcement on each side is connected with three transverse bars with diameter of 8mm, and the top surface of 16mm threaded steel bar is 2cm below the bottom of expansion joint profile steel. (c) The embedded reinforcement and anchor bar in the groove shall be straightened and straightened, and the embedded reinforcement shall be derusted. Dianbai bridge inspection car shall be used to rent road and bridge inspection vehicle, and the bridge detection vehicle shall be fully equipped. Xinyue road and Bridge Consulting Hotline: 1830208001
{Lankecms_eprev}
{Lankecms_enext}